SHEIKH ZAYED BRIDGE

ABU DHABI, UAE

One of the world’s most complex bridge projects

The Sheikh Zayed Bridge is an 842m long crossing linking the island city of Abu Dhabi and the mainland, providing a landmark structure at the entrance to Abu Dhabi; a remarkable combination of concrete pre-stressed boxes of 170m span, steel arches up to 60m high and cable stayed supports, including six pre-stressed concrete highway bridges, embankments and related highway and utilities works. The bridge opened to traffic on 25 November 2010.

High-Point Rendel has been involved in the project from its initial inception in the late 1990s. During this time, the company has completed alternative design schemes, development of design concepts with world-renowned architect Zaha Hadid, detailed design, tender document preparation and evaluation, and is currently supervising construction at site.

Useful Links

High-Point Rendel Limited     |     61 Southwark Street     |     London     |     SE1 1SA     |     United Kingdom   
Tel:
+44 20 7654 0400    Fax: +44 20 7654 0401    E-mail: london@hprworld.com

Website design and build by in.house.media